Pension Fund Call Center Networks.

  1. Date of Signing Contract: October 2008.
  2. Contract role: Main Contractor.
  3. Contract Duration: 4 Months.
  4. Date of Completion: February 2009.
  5. Value of the total contract at completion: Approx. 0.46 million L.E.
  6. Name of Employer: Bearing Point Co. – TAPR II (USAID Project)
  7. Employer Address: 8 El Sad Al Aali st. - Dokki
  8. Scope of work:
    • The project was executed in parallel with the civil works project, the main activities included the installation of air conditioning, electrical and lighting systems, data and VOIP networks, fire alarm system in addition to the queuing system. The data and VOIP systems have been connected through fiber optics cables to the main server in the same building.
    • All the wiring has been installed in metal fire-resistant pipes. Also floor boxes have been installed to the raised floor to host the power, data and VOIP outlets.